Tender

Pipeline-inspection services

Original title: Inspection of the natural gas transmission system Zhidilovo–Skopje and distribution pipeline Skopje South using the in-line method, and inspection of Deve Bair–Zhidilovo (0–4 km) and distribution pipelines Skopje North 1.8 km, Bunardzhik 5.4 km, Kumanovo 7.7 km, Kratovo 4.6 km and Kriva Palanka 1.5 km using NDT methods

CountryNorth Macedonia
Deadline2026-11-23 (2 days left)
Published2026-10-26
SourceTED - Tenders Electronic Daily (EU)

Summary

Services for inspection of the natural gas transmission system Zhidilovo–Skopje and the distribution pipeline Skopje South using in-line inspection (ILI), as well as inspection of the Deve Bair–Zhidilovo section (0–4 km)…

The buyer, the value, the full description and the link to the official notice are available with a free account.